• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
New England Transportation Consortium

New England Transportation Consortium

New England Transportation Consortium

  • About NETC
    • Organizational Structure
    • Polices and Procedures
    • Links
    • Accomplishments
    • Committees
  • Research
    • All Research Projects
    • NETC Annual Research Program Schedule
    • Requests for Proposals
    • Research Problem Statements
    • Unfunded Research
    • Information for PI
    • NETC Webinars – Available Recordings and Presentations
  • Reports
    • Completed Research Project Reports
    • Completed Administrative Reports
  • Events/Meetings
    • Advisory Committee Meetings
    • Symposiums
      • 2022 NETC Transportation Construction Symposium: Bridges and Pavements
      • 2021 Transportation Winter Maintenance Symposium
      • 2019 Symposium
    • Topical Discussions
      • 2024 Topical Discussion: Geotech
      • 2024 Topical Discussion: Advanced Air Mobility Regional Plan
      • 2024 Topical Discussion: Animal-Vehicle Collision Avoidance
    • 2024 NETC Research Peer Exchange
  • Connect
    • Contact NETC
    • Mailing List
  • Member Area

Kirsten Seeber

March 28, 2017 Advisory Committee Meeting

AGENDA

NETC ADVISORY COMMITTEE MEETING

DATE:                       March 28, 2017

TIME:                        11:00 a.m. – 12:00 p.m.

LOCATION:            Conference Call 1-866-906-7447

                                Participant Access Code 8626283

AGENDA ITEMs

Call to Order

Open Projects

Project # and Title PI, University

AC Liaison

Update End Date
13-1: Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections Brena,

UMass Amherst

 

C. Bradley

PI completed 90% of the project, but two tests remain. PI in communication with TAC chair and scheduling a TAC meeting. 1/14/17

(NCE)

13-2: HMA Mixtures Containing Recycled Asphalt Singles (RAS): Low Temperature Fatigue Performance of Plant-Produced Mixtures Mogawer,

UMass Dartmouth

 

A. Scholz

Since contractors have not yet provided PCAS mixtures, PI obtained PCAS to work on two mixture design. PI continues test PCAS mixtures and MSW mixtures. 12/1/17 (NCE)
13-3: Improved Regionalization of Quality Assurance (QA) Functions Dave,

UNH

 

C. Franco

DOTs working with VTrans to use existing SharePoint site to share QA data. PI and TAC will work to identify pilot projects to use tool. 4/2/17 (NCE)
14-2: Investigation of Northern Long-Eared Bat Roosting Sites on Bridges Civjan,

UMass Amherst

 

D. Peabody

PI held two training events to present results and get feedback on research and feasibility of draft bridge survey form. PI provided draft report to TAC for review and edits. 5/31/17

(NCE)

15-1: Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats Foster,

UNH

 

D. Peabody

Contract in process between UVM and UNH.

Coordinator contract extension received and contract processes moving forward.

TBD
15-2: Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers Samuel,

UMass Amherst

 

D. Peabody

Contract fully executed between UMass Amherst and UVM. PI working with VTTI on data request. 12/31/18
15-3: Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England Dave,

UNH

 

D. Peabody

Contract between UVM and UNH fully executed. PI has begun literature review. PI held kick-off meeting to discuss research plan and scheduling. PI sending survey to identify mixtures and projects for 2017 construction season. 7/31/18
*Final Tech Transfer Items:  Currently these include the final report to the TAC; a “Fact Sheet” summary – NETC template; a presentation to the TAC and other interested DOT participants that is recorded by NETC and made available.

NETC Research Distribution List_2017

NETC Advisory Committee Discussion of Research Topics

  • New England roundabouts
    • Have received NH, CT, ME and RI TAC member
    • Please send names and contact information for TAC members
  • Implement recommendations on Effective Establishment of Native Plants on Roadsides
    • Have received support from ME and CT TAC members
    • Please send any additional names and contact information for TAC members

NETC New England Networks Inventory

  • Please return to Coordination Team by 4/14/2017

Other Business

  • Region 1 UTC has not been awarded
    • The new solicitation has not yet been issued, but the Coordinator will inform the advisory committee when it is issued
  • NETC Program Review Follow-up April 12, 2017 10 AM -12PM
  • NETC Program Review In-person meeting to be scheduled for June (except week of June 12th )
  • NETC Advisory Meeting Next Monthly Meeting – April 25, 2017, 11 AM – 12 PM

Adjourn

Filed Under: Meetings

February 28, 2017 Advisory Committee Meeting

NETC ADVISORY COMMITTEE MEETING

 

DATE:                      February 28, 2017

TIME:                       11:00 a.m. – 12:00 p.m.

LOCATION:             Conference Call 1-866-906-7447

                                 Participant Access Code 8626283

AGENDA ITEM

Call to Order

Open Projects

Project # and Title PI, University

AC Liaison

Update End Date
10-3: Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology Mogawer,

UMass Dartmouth

 

A. Scholz

PI continued to analyze mixtures tested to date. The PI has not yet received high RAP mixtures prepared using foaming as the WMA technology.

 

5/31/17

(NCE)

13-1: Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections Brena,

UMass Amherst

 

C. Bradley

PI completed 90% of the project, but three tests remain. 1/14/17

(NCE)

13-2: HMA Mixtures Containing Recycled Asphalt Singles (RAS): Low Temperature Fatigue Performance of Plant-Produced Mixtures Mogawer,

UMass Dartmouth

 

A. Scholz

Since contractors have not yet provided PCAS mixtures, PI obtained PCAS to work on two mixture design. PI continues test PCAS mixtures and MSW mixtures. 12/1/17 (NCE)
13-3: Improved Regionalization of Quality Assurance (QA) Functions Dave,

UNH

 

C. Franco

DOTs working with VTrans to use existing SharePoint site to share QA data. PI and TAC will work to identify pilot projects to use tool. Meeting expected shortly. 4/2/17 (NCE)
14-2: Investigation of Northern Long-Eared Bat Roosting Sites on Bridges Civjan,

UMass Amherst

 

D. Peabody

PI working scheduling two training events for the week of March 13 – 17 in NH (ME and VT will attend) and MA (CT and RI will attend). The training will be recorded. NCE in process between UVM and UMass. 4/17/17
14-4: Optimizing Future Work Zones in New England for Safety and Mobility Xie,

UMASS Lowell

 

C. Bradley

PI requested additional data from VTTI, which may delay analysis. 7/5/17
15-1: Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats Foster,

UNH

 

D. Peabody

Contract in process between UVM and UNH. Coordinator contract extension required to execute contract with full 24 month project plan. TBD
15-2: Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers Samuel,

UMass Amherst

 

D. Peabody

TAC would like colleagues from FHWA Safety Training and Analysis Center and Penn State to participate as non-voting advisers. Contract in process UMass Amherst and UVM. Coordinator contract extension required to execute contract with full 24 month project plan. TBD
15-3: Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England Dave,

UNH

 

D. Peabody

Contract between UVM and UNH fully executed. PI has begun literature review. PI scheduled kick-off meeting for March 6, 2017. 7/31/18
15-4: Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction Awaiting final 13-3 report (expected Spring 2017) to inform this.
*Final Tech Transfer Items:  Currently these include the final report to the TAC; a “Fact Sheet” summary – NETC template; a presentation to the TAC and other interested DOT participants that is recorded by NETC and made available.

NETC Fund Balance Update

  • All previous fund transfers have been completed or are in process with FHWA
  • FY2017 Fund Balance Transfers – Decision deferred
  • NETC Fund Balance as of 12/31/2018– $116,257.69 (without FY17 contributions, and without additional activities)

NETC Advisory Committee Discussion of Research Topics

  • Rumble Strips
  • New England roundabouts
  • Implement recommendations on Effective Establishment of Native Plants on Roadsides
    • Implement Recommendations of Native Plants on Roadsides Proposed deliverables
    • Information on report: http://nenativeplants.uconn.edu/index.php
    • FHWA: https://www.environment.fhwa.dot.gov/ecosystems/Pollinators_Roadsides/
  • Additional Topics?

NETC New England Networks Inventory

  • Questions regarding formatting or content
  • Consider sending to University and other Partners?
  • Please return to Coordination Team by 3/28/2017

Other Business

  • NETC Program Review Follow-up to be scheduled for mid-March
  • NETC Program Review In-person meeting to be scheduled for June
  • NETC Advisory Meeting Next Monthly Meeting – March 28, 2017, 11 AM – 12 PM

Adjourn

Filed Under: Meetings

January 24, 2017 Advisory Committee Meeting

NETC ADVISORY COMMITTEE MEETING

DATE:                       January 24, 2017

TIME:                        11:00 a.m. – 12:00 p.m.

LOCATION:             Conference Call 1-866-906-7447

                                 Participant Access Code 8626283

AGENDA:

Call to Order

Open Projects

Project # and Title PI, University

AC Liaison

Update End Date
09-3: Advanced Composite Materials in New England’s Transportation Infrastructure Lopez-Anido,

U of Maine

 

 

Technical Committee approved final report and PI submitted report and tech transfer items to chair and NETC Coordinator. Coordinator reviewing and will distribute on website and via email. Complete
10-3: Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology Mogawer,

UMass Dartmouth

 

 

PI continued to analyze mixtures tested to date. PI did not receive mixtures from the contractor as expected, but PI is in contact with the contractor. 5/31/17

(NCE)

13-2: HMA Mixtures Containing Recycled Asphalt Singles (RAS): Low Temperature Fatigue Performance of Plant-Produced Mixtures Mogawer,

UMass Dartmouth

 

 

PI developed and tested performance of two PCAS mixtures. PI continues work to get requested MSW mixtures from contractor and identify additional contractors to produce PCAS mixtures and MSW mixtures. 12/1/17 (NCE)
13-3: Improved Regionalization of Quality Assurance (QA) Functions Dave,

UNH

 

 

PI working to incorporate TAC comments into final report and excel tools for plant certification and QA inspections. DOTs working with VAOT to use existing Share Point site to share QA data. PI and TAC will work to identify pilot projects to use tool. 4/2/17 (NCE)
14-2: Investigation of Northern Long-Eared Bat Roosting Sites on Bridges Civjan,

UMass Amherst

 

 

PI working with Technical Committee to organize three workshops in March for DOT staff and consultants. Advisory Committee reviewing NCE request. 4/17/17
14-4: Optimizing Future Work Zones in New England for Safety and Mobility Xie,

UMASS Lowell

 

 

PI analyzed data from MA SWZ and simulations. Identified five TTCPs and prepared to test them via driving simulation and Vissim. Abstract approved for 2017 Road Safety & Simulation Conference to be held in The Hague, Netherland. PI requesting additional data from VTTI, which may delay analysis. 7/5/17
15-1: Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats Foster,

UNH

 

 

Contract in process between UVM and UNH.

 

TBD
15-2: Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers Samuel,

UMass Amherst

 

 

Contract in process UMass Amherst and UVM. TBD
15-3: Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England Dave,

UNH

 

 

Contract between UVM and UNH fully executed. PI has begun literature review. PI will schedule kick-off meeting and distribute survey to DOTs. 7/31/18
15-4: Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction Awaiting final 13-3 report (expected around March, 2017) to inform this. Consider having TAC participate in next meeting of 13-3 to gather lessons learned.
*Final Tech Transfer Items:  Currently these include the final report to the TAC; a “Fact Sheet” summary – NETC template; a presentation to the TAC and other interested DOT participants that is recorded by NETC and made available.

NETC Fund Balance Update

  • All previous fund transfers have been completed or are in process with FHWA
  • FY2017 Fund Balance Transfers – Decision deferred
  • NETC Fund Balance as of 12/31/2018– $116,257.69 (without FY17 contributions, and without additional activities)

NETC Coordination Contract Extension

  • UVM will request extension to February 15, 2019
  • Extension will allow UVM to execute contracts for NETC 15-1 and 15-2 in keeping with 24 month project timeline approved by the Advisory Committee

Request for information regarding NETC Bridge Rail report, FHWA-RD 98-044

  • The US Attorney’s Office in Rhode Island requested information about NETC Bridge Rail
  • Jeff Folsom, MaineDOT Assistant Bridge Program Manager spoke with the US Attorney’s Office about Maine’s standards based on the report

Other Business

  • NETC 14-2 No Cost Extension Request
  • NETC Advisory Meeting – Retreat Follow Up Early February
    • Agenda to follow
    • Reminder will include discussion of potential quick response research projects
  • Next Meeting – February 28, 2017, 11 AM – 12 PM

Adjourn

Filed Under: Meetings

November 22, 2016 NETC Advisory Committee Meeting

NETC ADVISORY COMMITTEE MEETING

DATE:                       November 22, 2016

TIME:                        11:00 a.m. – 12:00 p.m.

LOCATION:             Dail-in 1-866-906-7447,  Participant Access Code 8626283

AGENDA ITEM

Call to Order

Open Projects

Project # and Title PI, University Update End Date
07-1: In-Place Response Mechanisms of Recycled Layers Due to Temperature and Moisture Variations Daniel,

UNH

PI submitted final report in NETC format and fact sheet for tech transfer. Coordinator reviewing report prior to publication on website. Complete
09-2: Effective Establishment of Native Grasses on Roadsides Kuzovkina,

UConn

TC Chair working on one page summary of potential implementation. Coordinator received request for printed report from local Conservation Commission in CT.

PI submitted final report in NETC format and fact sheet for tech transfer. Coordinator reviewing report prior to publication on website.

Complete
13-1: Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections Brena,

UMass Amherst

NCE request approved by Advisory Committee, contract extension in process between UVM and UMass Amherst. 1/14/17

(NCE)

13-3: Improved Regionalization of Quality Assurance (QA) Functions Dave,

UNH

PI and TC had productive meeting re QA practices and PI updating recommendations based on comments. TC optimistic about increased coordination and communication that results from project. At next meeting, PI and TC will discuss potential projects to pilot uniform QA practices. 4/2/17 (NCE)
14-1: Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians Ahmadjian

UMass Amherst

NCE fully executed between UVM and UMass Amherst. PI and team worked on gap analysis and framework for creating Competency Models. 12/31/16

(NCE)

14-2: Investigation of Northern Long-Eared Bat Roosting Sites on Bridges Civjan,

UMass Amherst

TC recommends NCE to end of May, 2017 to allow research to disseminate results at International Conference on Ecology & Transportation. Coordinator will send ballot to AC. 4/17/17
14-4: Optimizing Future Work Zones in New England for Safety and Mobility Xie,

UMASS Lowell

PI and TC had productive meeting and PI working on testing temporary traffic control strategies. PI showed virtual reality tool for driving simulation. 7/5/17
15-1: Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats Foster,

UNH

Initial contract documents being drafted between UVM and UNH. Proposed end date 10/31/18
15-2: Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers Samuel,

UMass Amherst

Selected University notified and agreed to incorporate TC’s comment in project plan.

Contract in process between UVM and UNH.

TBD
15-3: Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England Dave,

UNH

Initial contract documents being drafted between UVM and UNH. TBD
15-4: Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction Awaiting finalization of 13-3 and report to inform this project and hold new kick off meeting.

NETC Fund Balance Update

  • FY 2015 Fund Balance Transfers
    • RI – transfer completed
    • CT – transfer requested
    • MA – FHWA has not yet received transfer request
  • FY2017 Fund Balance Transfers – Pending Decision
  • NETC Fund Balance as of 12/31/2018– $116,257.69 (without FY17 contributions, and without additional activities)

Other Business

  • FHWA Soliciting INVEST Implementation Projects – Round 3
    • Applied research funding opportunity for transportation agencies to use INVEST to evaluate the sustainability of their projects and programs, identify areas for improvement, analyze options for improving sustainability, and document results
    • Projects $20,000 to $50,000, with matching requirement
    • Letter of interest due January 5, 2017
    • Webinar on funding opportunity: http://connectdot.connectsolutions.com/p8lhrgd0dn5/?launcher=false&fcsContent=true&pbMode=normal
  • NETC ADVISORY COMMITTEE MEETING
    • Scheduled for December 27, 2016, 11 AM – 12 PM
  • NETC Advisory Meeting – Retreat Follow Mid December
    • Date TBD
    • Agenda to follow

Adjourn

Filed Under: Meetings

October 25, 2016 Advisory Committee meeting

NETC Advisory Committee Meeting

Date & Time: Tuesday, October 25, 2016, 11:00 AM – 12:00 PM

Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283

Agenda and Documents

Below are links to documents that will be discussed during the meeting. (starred* documents require Advisory Committee approval)

1. Call to Order/Roll Call

2. Open Projects

Project # and Title PI, University Update End Date
06-04: Preventive Maintenance and Timing of Applications Mogawer,

UMass Dartmouth

PI is working to address the Technical Committee’s comments on the draft final report and will submit a revised report. Complete
07-1: In-Place Response Mechanisms of Recycled Layers Due to Temperature and Moisture Variations Daniel,

UNH

Final report received and accepted by Technical Committee. PI has agreed to complete final tech transfer items and has templates. Complete
09-2: Effective Establishment of Native Grasses on Roadsides Kuzovkina,

UConn

Final report received and accepted by Technical Committee. PI has agreed to submit a revised final report in the NETC format and complete final tech transfer items. Complete
09-3: Advanced Composite Materials in New England’s Transportation Infrastructure Lopez-Anido,

U of Maine

Final report received and accepted by the Technical Committee. PI has agreed to complete final tech transfer items and has templates. Complete
10-3: Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology Mogawer,

UMass Dartmouth

NCE fully executed between UVM and UMass Dartmouth. PI working with second contractor and has tested three mixtures. 5/31/17

(NCE)

13-1: Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections Brena,

UMass Amherst

NCE request approved by Advisory Committee, contract extension in process between UVM and UMass Amherst. PI completed literature review and is developing mix design and conducted pilot tests. 1/14/17

(NCE)

13-2: HMA Mixtures Containing Recycled Asphalt Singles (RAS): Low Temperature Fatigue Performance of Plant-Produced Mixtures Mogawer,

UMass Dartmouth

NCE fully executed between UVM and UMass Dartmouth. PI compiled survey results and discussed production of mixtures with consultant. 12/1/17 (NCE)
13-3: Improved Regionalization of Quality Assurance (QA) Functions Dave,

UNH

NCE fully executed between UVM and UNH. PI provided quarterly report, including recommendations for QA practices, currently under review by the Technical Committee. 4/2/17 (NCE)
14-1: Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians Ahmadjian,

UMass Amherst

NCE approved to 12/31/2016, contract extension in process between UVM and UMass Amherst. No further updates awaiting next quarterly progress report. 12/31/16 (NCE)
14-2: Investigation of Northern Long-Eared Bat Roosting Sites on Bridges Civjan,

UMass Amherst

Field monitoring complete and final data analysis underway. 4/17/17
14-4: Optimizing Future Work Zones in New England for Safety and Mobility Xie,

UMASS Lowell

Received Naturalistic Driving Study data and have begun analysis. Tentatively selected location for evaluating proposed temporary traffic control strategies. 7/5/17
15-1: Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats Foster,

UNH

Selected University notified and contract in process between UVM and UNH. Proposed end date 10/31/18
15-2: Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers Samuel,

UMass Amherst

Technical Committee selected UMass Amherst Proposals and Advisory Committee reviewing ballot. TBD
15-3: Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England Dave,

UNH

Initial contract documents being drafted between UVM and UNH. TBD
15-4: Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction Scope of work development delayed until NETC Program is revised and relaunched. Awaiting finalization of 13-3 and report to inform this.

3. NETC Fund Balance Update

  • FY2016 Fund Balance Transfers – 0.00
  • FY2017 Fund Balance Transfers – Pending Decision
  • NETC Fund Balance as of 12/31/2018– $116,257.69 (without FY17 contributions, and without additional activities)

4. Other Business

  • NETC Policies and Procedures Changes (Final Reports)*
    • Proposed Policies and Procedures Changes – Final Reports
  • NETC Advisory Meeting – Retreat Follow Early November
    • Agenda to follow
    • Reminder NH and ME will provide update on Bridge-rail crash testing
    • Reminder VT, NH and Coordinator will provide update on quick response project
  • Next Meeting – November 22, 2016, 11 AM – 12 PM
    • Merge November and December meeting, meet Tue. Dec. 13th, 11:00AM-12:00PM

5. Adjourn

 

Filed Under: Meetings

September 27, 2016 Advisory Committee Meeting

NETC Advisory Committee Meeting

Date & Time: Tuesday, September 27, 2016, 11:00 AM – 12:00 PM

Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283

Agenda and Documents

Below are links to documents that will be discussed during the meeting. (starred* documents require Advisory Committee approval)

1. Call to Order/Roll Call

2. Open Projects

  • 06-4 Preventive Maintenance and Timing of Applications, PI Mogawer: Ending 9/15/16 – No update, awaiting final quarterly progress report and final technical committee meeting.
  • 07-1 In-Place Response Mechanisms of Recycled Layers Due to Temperature and Moisture Variations, PI Daniel: Final report received and accepted by Technical Committee. PI has agreed to complete final tech transfer items, details to be addressed.
  • 09-2 Effective Establishment of Native Grasses on Roadsides, PI Kuzovkina: Final report received and accepted by Technical Committee. PI has agreed to complete final tech transfer items, details to be addressed.
  • 09-3 Advanced Composite Materials in New England’s Transportation Infrastructure, PI Lopez-Anido: Final report received no comments yet from the Technical Committee.
  • 10-3 Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology, PI Mogawer: NCE Request approved by Advisory Committee, extension in process between UVM and UMass Dartmouth.
  • 13-1 Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections, PI Brena: NCE approved by Advisory Committee, contract extension in process between UVM and UMass Amherst.
  • 13-2 HMA Mixtures Containing Recycled Asphalt Singles (RAS): Low Temperature Fatigue Performance of Plant-Produced Mixtures, PI Mogawer: NCE approved to 12/1/2017, extension in process between UVM and UMass Dartmouth.
  • 13-3 Improved Regionalization of Quality Assurance (QA) Functions, PI Dave: NCE approved to 9/30/2016, contract extension in process between UVM and UNH.
  • 14-1 Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians, PI Ahmadjian: NCE approved to 12/31/2016, contract extension in process between UVM and UMass Amherst.
  • 14-2 Investigation of Northern Long-Eared Bat Roosting Sites on Bridges, PI Civjan: Summer bridge roosting monitoring is underway, as is the Inspection Reporting.  No further updates, awaiting next quarterly progress report.
  • 14-4 Optimizing Future Work Zones in New England for Safety and Mobility, PI Xie: No further updates awaiting next quarterly progress report.
  • 15-1 Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats: Ballots received by Advisory committee in the affirmative. Selection notifications and contract drafting to begin.
  • 15-2 Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers: Proposal evaluations are complete, ballot to be shared with Advisory Committee members 9/27/2016.
  • 15-3 Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England: Initial contract documents being drafted between UVM and UNH.
  • 15-4 Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction: Scope of work development delayed until NETC Program is revised and relaunched.

3. NETC Fund Balance Update

  • FY2016 Fund Transfers
  • Current Balance
  • FY2017 Fund Transfers

4. Other Business

  • NETC Advisory Meeting – Retreat Follow Up, Oct. 5 2016
    • Agenda to follow
    • Reminder of Peer-Network Survey
  • NETC Policies and Procedures Changes (Final Reports)
  • Addition of University of New Haven (private Univ. in Conn.) as one of the institutes eligible for NETC RFPs
  • Multi-State Overweight Limit Permit Program (informational inquiry)

5. Adjourn

Next Meeting – October 25, 2016, 11 AM – 12 PM

Filed Under: Meetings

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Go to Next Page »

Primary Sidebar

Search This Site

NETC Resources

  • 2024 NETC Research Peer Exchange
  • Completed Research Projects
    • 21-3 Initiating Seed Production for Effective Establishment of Native Plants on Roadsides in New England
    • 19-3 Load Rating Procedures for Steel Beam Ends
    • 20-2 Current Status of Transportation Data Analytics and Pilot Case Studies Using Artificial Intelligence (AI)
    • 21-1 Quality Review and Assessment of Pavement Condition Survey Vehicle Data Across New England
    • 20-3 Investigating Thermal Imaging Technologies and Unmanned Aerial Vehicles to Improve Bridge Inspections
    • 20-4 New England Connected and Automated Vehicle Legal, Regulatory and Policy Assessment – Members Only page
  • Research Project Webinars
  • Advisory Committee Meetings