• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
New England Transportation Consortium

New England Transportation Consortium

New England Transportation Consortium

  • About NETC
    • Organizational Structure
    • Polices and Procedures
    • Links
    • Accomplishments
    • Committees
  • Research
    • All Research Projects
    • NETC Annual Research Program Schedule
    • Requests for Proposals
    • Research Problem Statements
    • Unfunded Research
    • Information for PI
    • NETC Webinars – Available Recordings and Presentations
  • Reports
    • Completed Research Project Reports
    • Completed Administrative Reports
  • Events/Meetings
    • Advisory Committee Meetings
    • Symposiums
      • 2022 NETC Transportation Construction Symposium: Bridges and Pavements
      • 2021 Transportation Winter Maintenance Symposium
      • 2019 Symposium
    • Topical Discussions
      • 2024 Topical Discussion: Geotech
      • 2024 Topical Discussion: Advanced Air Mobility Regional Plan
      • 2024 Topical Discussion: Animal-Vehicle Collision Avoidance
    • 2024 NETC Research Peer Exchange
  • Connect
    • Contact NETC
    • Mailing List
  • Member Area

NETC May 23, 2017 Advisory Committee Meeting

AGENDA

NETC ADVISORY COMMITTEE MEETING

DATE:                       May 23, 2017

TIME:                        11:00 a.m. – 12:00 p.m.

LOCATION:             Conference Call 1-866-906-7447

                                 Participant Access Code 8626283

AGENDA ITEM

Open Projects

Project # and Title PI, University

AC Liaison

Update End Date
06-04: Preventive Maintenance and Timing of Applications Mogawer,

UMass Dartmouth

 

C. Franco

TAC provided a few comments on report and the PI is finalizing the report to incorporate these comments. Complete
10-3: Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology Mogawer,

UMass Dartmouth

 

A. Scholz

PI is finalizing the report and scheduling a TAC meeting to receive feedback. 5/31/17
13-1: Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections Brena,

UMass Amherst

 

C. Bradley

TAC supports extension and budget increase and working with PI to finalize new testing plan. TBD

 

13-2: HMA Mixtures Containing Recycled Asphalt Shingles (RAS): Low Temperature and Fatigue Performance of Plant-Produced Mixtures Mogawer,

UMass Dartmouth

 

 

A. Scholz

PI continuing work and scheduling TAC meeting to provide interim updates. 12/1/17
13-3: Improved Regionalization of Quality Assurance (QA) Functions Dave,

UNH

 

C. Franco

PI revised final report based on TAC comments. Final report in NETC format expected by the end of the month. 4/2/17 (NCE)
14-1: Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians Ahmadjian,

UMass Amherst

TAC approved no cost extension request. 12/31/17

(NCE request)

14-2: Investigation of Northern Long-Eared Bat Roosting Sites on Bridges Civjan,

UMass Amherst

 

D. Peabody

Expect final report at the end of May. PI presented results at International Conference on Ecology and Transportation in May. 5/31/17

(NCE)

14-4: Optimizing Future Work Zones in New England for Safety and Mobility Xie,

UMASS Lowell

 

C. Bradley

The PI researching motion simulators and eye tracking devices to improve simulation testing. Will request NCE this week. TAC has tentatively approved NCE. 7/5/17
15-1: Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats Foster, UNH

 

 

D. Peabody

Kickoff meeting is being scheduled for May or early June. 11/30/18
15-2: Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers Samuel,

UMass Amherst

 

D. Peabody

PI continuing work and no update to report. 12/31/18
15-3: Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England Dave,

UNH

 

D. Peabody

PI continuing work and no update to report. 7/31/18
*Final Tech Transfer Items:  Currently these include the final report to the TAC; a “Fact Sheet” summary – NETC template; a presentation to the TAC and other interested DOT participants that is recorded by NETC and made available.

NETC Fund Balance Update

  • All previous fund transfers have been completed
  • FY2016 Fund Balance Transfers – 0.00
  • FY2017 Fund Balance Transfers – Decision deferred, but budgeted by each state
  • NETC Unallocated Balance as of 5/19/2017 – $121,990.32

NETC “Pre-TAC” Discussion of Research Topics

  • Implement recommendations on Effective Establishment of Native Plants on Roadsides
    • Recommends funding research to test two plots in each state
    • Recommends test plots for at least two growing seasons – through 2019
    • State DOTs and local organizations will have to work to identify “workhorse species” and support a market for these seeds
    • Expect budget of $87,000 for this research
    • UConn and URI both have research expertise
  • Roundabout Quick Response
    • Working to schedule meeting time

New England Materials and Research Engineers Meeting

  • MassDOT materials lab in Hopkinton, MA on June 13, 2017
    • NEMREM finalizing agenda
  • NETC Advisory Committee approved sponsorship
  • NETC slot on the agenda to present relevant research and NETC Program Review and will take meeting notes on potential research topics
    • NETC Presentation: brief summary of all research with focus on 10-3 and 13-3; NETC processes and update from Program Review

NETC In-Person Retreat at NH DOT

  • Focus on Coordinator Statement of Work
  • Standard Operating Procedure
  • Nate Kane, ME DOT to facilitate

Other Business

  • AV/CV Working Group Conference on June 20TH at NH DOT
  • NETC Program Review In-person meeting scheduled for June 27th 10:30am – 5:00pm
  • ME and VT attending 2017 National RAC and TRB State Representatives Meeting in Louisville, Kentucky in July 24-27
  • NETC Advisory Meeting Next Monthly Meeting – July 25th at 11am

Adjourn

Filed Under: Meetings

Primary Sidebar

Search This Site

NETC Resources

  • 2024 NETC Research Peer Exchange
  • Completed Research Projects
    • 21-3 Initiating Seed Production for Effective Establishment of Native Plants on Roadsides in New England
    • 19-3 Load Rating Procedures for Steel Beam Ends
    • 20-2 Current Status of Transportation Data Analytics and Pilot Case Studies Using Artificial Intelligence (AI)
    • 21-1 Quality Review and Assessment of Pavement Condition Survey Vehicle Data Across New England
    • 20-3 Investigating Thermal Imaging Technologies and Unmanned Aerial Vehicles to Improve Bridge Inspections
    • 20-4 New England Connected and Automated Vehicle Legal, Regulatory and Policy Assessment – Members Only page
  • Research Project Webinars
  • Advisory Committee Meetings

Copyright © 2025 · New England Transportation Consortium · Log in