• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
New England Transportation Consortium

New England Transportation Consortium

New England Transportation Consortium

  • About NETC
    • Organizational Structure
    • Polices and Procedures
    • Links
    • Accomplishments
    • Committees
  • Research
    • All Research Projects
    • NETC Annual Research Program Schedule
    • Requests for Proposals
    • Research Problem Statements
    • Unfunded Research
    • Information for PI
    • NETC Webinars – Available Recordings and Presentations
  • Reports
    • Completed Research Project Reports
    • Completed Administrative Reports
  • Events/Meetings
    • Advisory Committee Meetings
    • Symposiums
      • 2022 NETC Transportation Construction Symposium: Bridges and Pavements
      • 2021 Transportation Winter Maintenance Symposium
      • 2019 Symposium
    • Topical Discussions
      • 2024 Topical Discussion: Geotech
      • 2024 Topical Discussion: Advanced Air Mobility Regional Plan
      • 2024 Topical Discussion: Animal-Vehicle Collision Avoidance
    • 2024 NETC Research Peer Exchange
  • Connect
    • Contact NETC
    • Mailing List
  • Member Area

NETC July 25, 2017 Advisory Committee Meeting

DATE:                       June 25, 2017

TIME:                        11:00 a.m. – 12:00 p.m.

LOCATION:             Conference Call 1-866-906-7447

                                 Participant Access Code 8626283

AGENDA ITEMS

Call to Order

Open Projects

Project # and Title PI, University

AC Liaison

Update End Date
06-04: Preventive Maintenance and Timing of Applications Mogawer,

UMass Dartmouth

 

C. Franco

PI is finalized the report and is working on the poster and fact sheet. We are editing the report for the website. Complete
10-3: Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology Mogawer,

UMass Dartmouth

 

A. Scholz

PI is finalizing the report and scheduling a TAC meeting to receive feedback. 5/31/17
13-1: Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections Brena,

UMass Amherst

 

MassDOT

Contract extension in process between UVM and Amherst, awaiting UMass signatures. 12/31/17

(NCE)

13-2: HMA Mixtures Containing Recycled Asphalt Shingles (RAS): Low Temperature and Fatigue Performance of Plant-Produced Mixtures Mogawer,

UMass Dartmouth

 

 

A. Scholz

PI met with TAC to update them on new work plan to maintain research schedule. More of the mixtures will be produced in the lab because unable to get them from the plants. TAC supported change. 12/1/17
13-3: Improved Regionalization of Quality Assurance (QA) Functions Dave,

UNH

 

C. Franco

Final report in NETC format expected this week. 4/2/17 (NCE)
14-1: Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians Ahmadjian,

UMass Amherst

 

 

 

D. Peabody

No cost extension fully executed between UVM and Amherst. Project ongoing. 12/31/17 (NCE)
14-2: Investigation of Northern Long-Eared Bat Roosting Sites on Bridges Civjan,

UMass Amherst

 

D. Peabody

Received final report and final edits and approval from TAC. Completing final review and edit for website. 5/31/17

(NCE)

14-4: Optimizing Future Work Zones in New England for Safety and Mobility Xie,

UMASS Lowell

 

MassDOT

The PI researching motion simulators and eye tracking devices to improve simulation testing. TAC has approved NCE request. 12/31/17

(NCE Requested)
15-1: Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats Foster, UNH

 

 

D. Peabody

Held kickoff meeting at UNH. TAC pleased with strategy and PI has received some of the audio data needed from states. PI now has dual appointment at UNH and Northern Arizona University. 11/30/18
15-2: Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers Samuel,

UMass Amherst

 

D. Peabody

PI has Roadway Information Data, completed IRB for SHRP2 and expects SHRP2 data by end of August. 12/31/18
15-3: Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England Dave,

UNH

 

D. Peabody

PI analyzed survey results from all six states to plan lab tests. Sampled mixtures from VT and ME and expect to sample more this summer. Started to test the mixes that they have. 7/31/18
15:4 Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction

in the Northeast

TBD

 

 

 

 

A. Scholz

Working with 13-3 PI to set up meeting with TAC to review lessons learned from that project to restart this project TBD
*Final Tech Transfer Items:  Currently these include the final report to the TAC; a “Fact Sheet” summary – NETC template; a presentation to the TAC and other interested DOT participants that is recorded by NETC and made available.

NETC Fund Balance Update

  • All previous fund transfers have been completed
  • FY2016 Fund Balance Transfers – 0.00
  • FY2017 Fund Balance Transfers – Decision deferred, but budgeted by each state
  • FY2018 Fund Balance Transfers
  • NETC Unallocated Balance as of 7/24/2017 – $139,278.00
  • NETC Coordinator funded through 9/1/2018

NETC Research Processes

  • Start NETC Research Solicitation Process
    • 15 month process
    • Traditionally, starts in November
    • Can be started with one coordinator and transferred, if needed
    • Consider “Implement recommendations on Effective Establishment of Native Plants on Roadsides” for full research solicitation process
  • Quick Response Projects
    • “Pre-TAC” for AV/CV Vehicles?
    • Discuss “Pre-TAC” recommendations at next meeting

New England Materials and Research Engineers Meeting

  • Discussion of regionalization through National Transportation Product Evaluation Program
    • Several areas for potential regional research and regional audit programs
      1. Concrete blocks, pavement marking paint, binder QC plans
    • Will work with NEMREM to schedule when more people are available next year

NETC SOP

  • Updating to reflect discussions at retreat
    • Include quick response
    • Update tech transfer language
    • Lead state to issues contracts

Other Business

  • NETC Advisory Meeting Next Monthly Meeting – Tuesday, August 22nd at 11am

Adjourn

Filed Under: Meetings

Primary Sidebar

Search This Site

NETC Resources

  • 2024 NETC Research Peer Exchange
  • Completed Research Projects
    • 21-3 Initiating Seed Production for Effective Establishment of Native Plants on Roadsides in New England
    • 19-3 Load Rating Procedures for Steel Beam Ends
    • 20-2 Current Status of Transportation Data Analytics and Pilot Case Studies Using Artificial Intelligence (AI)
    • 21-1 Quality Review and Assessment of Pavement Condition Survey Vehicle Data Across New England
    • 20-3 Investigating Thermal Imaging Technologies and Unmanned Aerial Vehicles to Improve Bridge Inspections
    • 20-4 New England Connected and Automated Vehicle Legal, Regulatory and Policy Assessment – Members Only page