• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
New England Transportation Consortium

New England Transportation Consortium

New England Transportation Consortium

  • About NETC
    • Organizational Structure
    • Polices and Procedures
    • Links
    • Accomplishments
    • Committees
  • Research
    • All Research Projects
    • NETC Annual Research Program Schedule
    • Requests for Proposals
    • Research Problem Statements
    • Unfunded Research
    • Information for PI
    • NETC Webinars – Available Recordings and Presentations
  • Reports
    • Completed Research Project Reports
    • Completed Administrative Reports
  • Events/Meetings
    • Advisory Committee Meetings
    • Symposiums
      • 2022 NETC Transportation Construction Symposium: Bridges and Pavements
      • 2021 Transportation Winter Maintenance Symposium
      • 2019 Symposium
    • Topical Discussions
      • 2024 Topical Discussion: Geotech
      • 2024 Topical Discussion: Advanced Air Mobility Regional Plan
      • 2024 Topical Discussion: Animal-Vehicle Collision Avoidance
    • 2024 NETC Research Peer Exchange
  • Connect
    • Contact NETC
    • Mailing List
  • Member Area

June 28, 2016 Advisory Committee Meeting

NETC Advisory Committee Meeting

Date & Time: Tuesday, June 28, 2016, 11:00 AM – 12:00 PM

Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283

Agenda and Documents

Below are links to documents that will be discussed during the meeting. (starred* documents require Advisory Committee approval)

1. Call to Order/Roll Call

2. Open Projects

  • 06-4 Preventive Maintenance and Timing of Applications, PI Mogawer: Ending 9/15/16 – Draft Report is being developed by PI for review by Technical Committee
  • 07-1 In-Place Response Mechanisms of Recycled Layers Due to Temperature and Moisture Variations, PI Daniel: Ending 6/30/2016 – No update since NCE approved
  • 09-2 Effective Establishment of Native Grasses on Roadsides, PI Kuzovkina: Project has ended and is completed, a reminder regarding the Final Report was sent to the PI.
  • 09-3 Advanced Composite Materials in New England’s Transportation Infrastructure, PI Lopez-Anido: Project has ended and is complete, a reminder regarding a Final Report was sent to the PI.
  • 10-3 Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology, PI Mogawer: NCE Request recently approved by Technical Committee.
  • 13-1 Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections, PI Brena: NCE request to 1/14/17 is being reviewed by Technical Committee.
  • 13-2 HMA Mixtures Containing Recycled Asphalt Singles (RAS): Low Temperature Fatigue Performance of Plant-Produced Mixtures, PI Mogawer: NCE approved to 12/1/2017, contract extension in process.
  • 13-3 Improved Regionalization of Quality Assurance (QA) Functions, PI Dave: NCE approved to 9/30/2016, contract extension in process.
  • 14-1 Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians, PI Ahmadjian: NCE approved to 12/31/2016, contract extension in process.
  • 14-2 Investigation of Northern Long-Eared Bat Roosting Sites on Bridges, PI Civjan: Summer bridge roosting monitoring is underway, as is the Inspection Reporting.
  • 14-4 Optimizing Future Work Zones in New England for Safety and Mobility, PI Xie: Task I report accepted by Technical Committee, Task II underway.
  • 15-1 Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats: RFP reissued, pending TC review of received proposals for research team selection
  • 15-2 Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers: RFP issued, pending receipt of proposals
  • 15-3 Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England: Initial contract documents drafted, pending AC approval of NETC Master Agreement modification
  • 15-4 Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction: Scope of work development delayed until NETC Program is revised and relaunched.

3. Open Ballots:

CT MA ME NH RI VT
NETC Coordinator Contract Modification  X
10-3 No Cost Extension

4. Other Business

  • NETC 06-4, 10-3, 13-2: UMass has requested a budget change for all projects due to a recently renegotiated Federal Rate Contract
    • 26014-1302:
      • F & A         $1031.14
      • Supplies   -$1031.14
    • 26014-1003:
      • F & A         $431.14
      • Supplies   -$431.14
    • 26014-0604:
      • F & A          $788.94
      • Supplies    -$788.94
  • NETC Advisory Meeting, July 6, 2016
    • Venue – Teleconference – GoTo Meeting
    • Agenda Items
      • NETC Program Review and Revision
        • Continue discussion of the 6 Questions developed in April
        • Next steps for NETC Coordinator in regards to Tech Transfer
      • NETC Program Goals for 2017
        • Networks/Focus Groups to establish/partner with
        • Implementation Project Selection
      • Role of the Coordinator in 2017

5. Adjourn

Next Meeting – August 23, 2016, 11 AM – 12 PM

Filed Under: Meetings

Primary Sidebar

Search This Site

NETC Resources

  • 2024 NETC Research Peer Exchange
  • Completed Research Projects
    • 21-3 Initiating Seed Production for Effective Establishment of Native Plants on Roadsides in New England
    • 19-3 Load Rating Procedures for Steel Beam Ends
    • 20-2 Current Status of Transportation Data Analytics and Pilot Case Studies Using Artificial Intelligence (AI)
    • 21-1 Quality Review and Assessment of Pavement Condition Survey Vehicle Data Across New England
    • 20-3 Investigating Thermal Imaging Technologies and Unmanned Aerial Vehicles to Improve Bridge Inspections
    • 20-4 New England Connected and Automated Vehicle Legal, Regulatory and Policy Assessment – Members Only page