• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
New England Transportation Consortium

New England Transportation Consortium

New England Transportation Consortium

  • About NETC
    • Organizational Structure
    • Polices and Procedures
    • Links
    • Accomplishments
    • Committees
  • Research
    • All Research Projects
    • NETC Annual Research Program Schedule
    • Requests for Proposals
    • Research Problem Statements
    • Unfunded Research
    • Information for PI
    • NETC Webinars – Available Recordings and Presentations
  • Reports
    • Completed Research Project Reports
    • Completed Administrative Reports
  • Events/Meetings
    • Advisory Committee Meetings
    • Symposiums
      • 2022 NETC Transportation Construction Symposium: Bridges and Pavements
      • 2021 Transportation Winter Maintenance Symposium
      • 2019 Symposium
    • Topical Discussions
      • 2024 Topical Discussion: Geotech
      • 2024 Topical Discussion: Advanced Air Mobility Regional Plan
      • 2024 Topical Discussion: Animal-Vehicle Collision Avoidance
    • 2024 NETC Research Peer Exchange
  • Connect
    • Contact NETC
    • Mailing List
  • Member Area

Kirsten Seeber

August 23, 2016 Advisory Committee Meeting

NETC Advisory Committee Meeting

Date & Time: Tuesday, August 23, 2016, 11:00 AM – 12:00 PM

Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283

Agenda and Documents

Below are links to documents that will be discussed during the meeting. (starred* documents require Advisory Committee approval)

1. Call to Order/Roll Call

2. Open Projects

  • 06-4 Preventive Maintenance and Timing of Applications, PI Mogawer: Ending 9/15/16 – No update
  • 07-1 In-Place Response Mechanisms of Recycled Layers Due to Temperature and Moisture Variations, PI Daniel: Ended 6/30/2016 – Draft final report received and circulated to the technical committee.  Comments have been received and will be forwarded to the PI.
  • 09-2 Effective Establishment of Native Grasses on Roadsides, PI Kuzovkina: The Final Report was reviewed by the Technical Advisory Committee.  It has been accepted with comments and the PI has requested that she be able to share it with her networks freely.
  • 09-3 Advanced Composite Materials in New England’s Transportation Infrastructure, PI Lopez-Anido: Project has ended and is complete, draft final report was shared with the technical committee.  Deadline for comments is August 24.
  • 10-3 Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology, PI Mogawer: NCE request recently approved by Advisory Committee.  Will begin contract execution process.
  • 13-1 Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections, PI Brena: NCE request to 1/14/17 has been approved by Technical Committee.  Will be forwarded to Advisory Committee.
  • 13-2 HMA Mixtures Containing Recycled Asphalt Singles (RAS): Low Temperature Fatigue Performance of Plant-Produced Mixtures, PI Mogawer: NCE approved to 12/1/2017, contract extension in process.
  • 13-3 Improved Regionalization of Quality Assurance (QA) Functions, PI Dave: NCE approved to 9/30/2016, contract extension in process.  UNH has also requested a line item budget change from Graduate Students to Undergraduate students and the respective benefits adjustments.  This does not represent a change in scope for the project.
  • 14-1 Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians, PI Ahmadjian: NCE approved to 12/31/2016, contract extension in process.
  • 14-2 Investigation of Northern Long-Eared Bat Roosting Sites on Bridges, PI Civjan: Summer bridge roosting monitoring is underway, as is the Inspection Reporting.  No further updates.
  • 14-4 Optimizing Future Work Zones in New England for Safety and Mobility, PI Xie: Task I report accepted by Technical Committee, Task II underway.
  • 15-1 Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats: Proposal evaluation is complete a ballot for advisory committee review is being prepared.
  • 15-2 Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers: Proposals have been reviewed and questions have been sent to the project teams.
  • 15-3 Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England: Initial contract documents drafted, pending NETC Master Agreement modification.
  • 15-4 Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction: Scope of work development delayed until NETC Program is revised and relaunched.

3. Other Business

  • NETC Advisory Meeting – Retreat Follow Up, September, 2016
    • http://doodle.com/poll/9aa7w8zsh5bgwt6z

4. Adjourn

Next Meeting – September 27, 2016, 11 AM – 12 PM

Filed Under: Meetings

June 28, 2016 Advisory Committee Meeting

NETC Advisory Committee Meeting

Date & Time: Tuesday, June 28, 2016, 11:00 AM – 12:00 PM

Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283

Agenda and Documents

Below are links to documents that will be discussed during the meeting. (starred* documents require Advisory Committee approval)

1. Call to Order/Roll Call

2. Open Projects

  • 06-4 Preventive Maintenance and Timing of Applications, PI Mogawer: Ending 9/15/16 – Draft Report is being developed by PI for review by Technical Committee
  • 07-1 In-Place Response Mechanisms of Recycled Layers Due to Temperature and Moisture Variations, PI Daniel: Ending 6/30/2016 – No update since NCE approved
  • 09-2 Effective Establishment of Native Grasses on Roadsides, PI Kuzovkina: Project has ended and is completed, a reminder regarding the Final Report was sent to the PI.
  • 09-3 Advanced Composite Materials in New England’s Transportation Infrastructure, PI Lopez-Anido: Project has ended and is complete, a reminder regarding a Final Report was sent to the PI.
  • 10-3 Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology, PI Mogawer: NCE Request recently approved by Technical Committee.
  • 13-1 Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections, PI Brena: NCE request to 1/14/17 is being reviewed by Technical Committee.
  • 13-2 HMA Mixtures Containing Recycled Asphalt Singles (RAS): Low Temperature Fatigue Performance of Plant-Produced Mixtures, PI Mogawer: NCE approved to 12/1/2017, contract extension in process.
  • 13-3 Improved Regionalization of Quality Assurance (QA) Functions, PI Dave: NCE approved to 9/30/2016, contract extension in process.
  • 14-1 Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians, PI Ahmadjian: NCE approved to 12/31/2016, contract extension in process.
  • 14-2 Investigation of Northern Long-Eared Bat Roosting Sites on Bridges, PI Civjan: Summer bridge roosting monitoring is underway, as is the Inspection Reporting.
  • 14-4 Optimizing Future Work Zones in New England for Safety and Mobility, PI Xie: Task I report accepted by Technical Committee, Task II underway.
  • 15-1 Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats: RFP reissued, pending TC review of received proposals for research team selection
  • 15-2 Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers: RFP issued, pending receipt of proposals
  • 15-3 Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England: Initial contract documents drafted, pending AC approval of NETC Master Agreement modification
  • 15-4 Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction: Scope of work development delayed until NETC Program is revised and relaunched.

3. Open Ballots:

CT MA ME NH RI VT
NETC Coordinator Contract Modification  X
10-3 No Cost Extension

4. Other Business

  • NETC 06-4, 10-3, 13-2: UMass has requested a budget change for all projects due to a recently renegotiated Federal Rate Contract
    • 26014-1302:
      • F & A         $1031.14
      • Supplies   -$1031.14
    • 26014-1003:
      • F & A         $431.14
      • Supplies   -$431.14
    • 26014-0604:
      • F & A          $788.94
      • Supplies    -$788.94
  • NETC Advisory Meeting, July 6, 2016
    • Venue – Teleconference – GoTo Meeting
    • Agenda Items
      • NETC Program Review and Revision
        • Continue discussion of the 6 Questions developed in April
        • Next steps for NETC Coordinator in regards to Tech Transfer
      • NETC Program Goals for 2017
        • Networks/Focus Groups to establish/partner with
        • Implementation Project Selection
      • Role of the Coordinator in 2017

5. Adjourn

Next Meeting – August 23, 2016, 11 AM – 12 PM

Filed Under: Meetings

March 22, 2016 Advisory Committee Meeting

March 22, 2016 NETC Advisory Committee Meeting

NETC Advisory Committee Meeting

Date & Time: Tuesday, March 22, 2016, 11:00 AM – 12:00 PM

Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283

Agenda and Documents

Below are links to documents that will be discussed during the meeting. (starred* documents require Advisory Committee approval)

1. Call to Order/Roll Call

2. Approval of Minutes

NETC Adv Comm January 26 2016 Draft MINUTES

NETC Retreat February 29 2016 Draft MINUTES

3. Open Projects

  • 15-1 RFP to be reissued, pending recommendations of additional Universities to be included in RFP mailing
  • 15-4 Technical Committee Meeting Kick-Off

4. Open Ballots:

CT MA ME NH RI VT
13-3 No Cost Extension X X X
15-3 Research Proposals X X

5. Other Business

  • NETC Advisory Meeting, April 2016
    • Venue – NH DOT Materials and Research Building, 5 Hazen Drive
    • Date – Monday April 18, 2016
    • Agenda Items
      • Coordinator Contract RFP
        • Which states could assume lead agency role
        • What revisions would be needed
      • UVM Coordinator Contract Amendment
      • NETC Program Review and Revision
    • Facilitator – Committee approval needed to approach Nate Kane and MaineDOT
  • NETC Advisory Committee Chair – Pending acceptance by M.Sock of RIDOT

6. Adjourn

Next Meeting – May 24, 2016, 11 AM – 12 PM

Filed Under: Meetings

January 26, 2016 Advisory Committee Meeting

January 26, 2016 NETC Advisory Committee Meeting

NETC Advisory Committee Meeting

Date & Time: Tuesday, January 26, 2016, 11:00 AM – 12:00 PM

Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283

Draft Agenda and Documents

Below are links to documents that will be discussed during the meeting. (starred* documents require Advisory Committee approval)

1. Call to Order/Roll Call

2. Approval of Minutes

NETC Adv Comm December 1 2015 Draft MINUTES*

3. NETC Fund Balance, Transfers and 2015 Contributions

  • Update on SPR-3(089) – ME funds to be transferred
  • Update on TPF-5(222)
  • 2015 Contributions

4.  Policy Committee Approval for 2015 Research Program

  • Policy Committee Approval of 2015 Research Program (MA,ME,NH,RI,VT)*
  • 2014 ballots needed from MA and VT*

5. Open Projects

  • NETC Quarterly Progress Report (TPF Program Standard Format)
  • 15-3 Contract Selection – Ballot ready for AC
  • 15-1 No proposals submitted, next steps

6. Open Ballots:

  • NETC Policies and Procedures Revisions (ballots needed from MA)*

7. Other Business

  • NETC Advisory Meeting, February 29th
    • Venue
    • Agenda Items (full agenda to follow at a later date)
    • Facilitator (contract to follow at a later date)
  • NETC Advisory Committee Chair
  • NETC Lead State

8. General Updates and Reminders

  • Action Items 2015
  • Reminder to send any implementation of NETC research to NETC@uvm.edu

9. Adjourn

Next Meeting – February 23rd, 2016, 11 AM – 12 PM

 

Filed Under: Meetings

December 1, 2015 Advisory Committee Meeting

NETC Advisory Committee Meeting

Date & Time: Tuesday, December 1, 2015, 11:00 AM – 12:00 PM

Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283

Draft Agenda and Documents

Below are links to documents that will be discussed during the meeting. (starred* documents require Advisory Committee approval)

1. Call to Order/Roll Call

2. Approval of Minutes

NETC Adv Comm October 27 2015 Draft MINUTES

3. NETC Coordinator RFP

  • NETC Coordination Team – Reassignment April 2016

4.TPF-5(222) NETC Pooled Funded Project 8-24-15

  • Update on SPR-3(089) – ME funds to be transferred
  • Update on TPF-5(201) and TPF-5(222)
  • 2015 Contributions Update

5.  Open Ballots*

CT MA ME NH RI VT
2015 Research Program X X X

6. Quarterly Reports Sept 30, 2015

7. Other Business

  • PI Performance Evalutation Form Process
  • NETC Lead State
  • NETC Advisory Committee Chair
  • NETC Traffic Management Meeting

8. General Updates and Reminders

  • Update on Action Items 2015
  • Reminder to send any implementation of NETC research to NETC@uvm.edu

9. Adjourn

Next Meeting – January 26, 2016, 11 AM – 12 PM

Filed Under: Meetings

October 27, 2015 Advisory Committee Meeting

NETC Advisory Committee Meeting
Date & Time: Tuesday, October 27, 2015, 11:00 AM – 12:00 PM
Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283
Draft Agenda and Documents
Below are links to documents that will be discussed during the meeting.
(starred* documents require Advisory Committee approval)
1. Call to Order/Roll Call
2. Approval of Minutes*
NETC Adv Comm August 25 2015 Draft MINUTES
NETC Adv Comm September 22 2015 Draft MINUTES
3. NETC No-Cost-Extension for UVM Coordinator’s Contract
4. NETC Coordinator RFP
5. NETC Pooled Funded Project

  • Update on SPR-3(089) – Have ME Funds completed transfer?
  • Update on TPF-5(201)
  • 2015 Contributions Update

6.  Open Ballots*

CT MA ME NH RI VT
2015 Research Program X X X

7. Open Project Summary 10-20-2015

8. Peer Review of Dr. Azari’s research

9. Other Business

  • PI Performance Evalutation Form Draft
    • Recommended Process from NETC Coordination Team
  • NETC Lead State and Chair – February 2016
  • Changing November 24, 2015 committee call to November 17, 2015

10. General Updates and Reminders

  • Update on Action Items 2015
  • Reminder to send any implementation of NETC research to NETC@uvm.edu
  • NETC 05-2 Reimbursement

11. Adjourn

Next Meeting – November 24, 2015, 11 AM – 12 PM

Filed Under: Meetings

  • « Go to Previous Page
  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Go to Next Page »

Primary Sidebar

Search This Site

NETC Resources

  • 2024 NETC Research Peer Exchange
  • Completed Research Projects
    • 21-3 Initiating Seed Production for Effective Establishment of Native Plants on Roadsides in New England
    • 19-3 Load Rating Procedures for Steel Beam Ends
    • 20-2 Current Status of Transportation Data Analytics and Pilot Case Studies Using Artificial Intelligence (AI)
    • 21-1 Quality Review and Assessment of Pavement Condition Survey Vehicle Data Across New England
    • 20-3 Investigating Thermal Imaging Technologies and Unmanned Aerial Vehicles to Improve Bridge Inspections
    • 20-4 New England Connected and Automated Vehicle Legal, Regulatory and Policy Assessment – Members Only page
  • Research Project Webinars
  • Advisory Committee Meetings

Copyright © 2025 · New England Transportation Consortium · Log in