• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
New England Transportation Consortium

New England Transportation Consortium

New England Transportation Consortium

  • About NETC
    • Organizational Structure
    • Polices and Procedures
    • Links
    • Accomplishments
    • Committees
  • Research
    • All Research Projects
    • NETC Annual Research Program Schedule
    • Requests for Proposals
    • Research Problem Statements
    • Unfunded Research
    • Information for PI
    • NETC Webinars – Available Recordings and Presentations
  • Reports
    • Completed Research Project Reports
    • Completed Administrative Reports
  • Events/Meetings
    • Advisory Committee Meetings
    • Symposiums
      • 2022 NETC Transportation Construction Symposium: Bridges and Pavements
      • 2021 Transportation Winter Maintenance Symposium
      • 2019 Symposium
    • Topical Discussions
      • 2024 Topical Discussion: Geotech
      • 2024 Topical Discussion: Advanced Air Mobility Regional Plan
      • 2024 Topical Discussion: Animal-Vehicle Collision Avoidance
    • 2024 NETC Research Peer Exchange
  • Connect
    • Contact NETC
    • Mailing List
  • Member Area

August 23, 2016 Advisory Committee Meeting

NETC Advisory Committee Meeting

Date & Time: Tuesday, August 23, 2016, 11:00 AM – 12:00 PM

Conference Call: Dial-in 1-866-906-7447, Participant Code: 8626283

Agenda and Documents

Below are links to documents that will be discussed during the meeting. (starred* documents require Advisory Committee approval)

1. Call to Order/Roll Call

2. Open Projects

  • 06-4 Preventive Maintenance and Timing of Applications, PI Mogawer: Ending 9/15/16 – No update
  • 07-1 In-Place Response Mechanisms of Recycled Layers Due to Temperature and Moisture Variations, PI Daniel: Ended 6/30/2016 – Draft final report received and circulated to the technical committee.  Comments have been received and will be forwarded to the PI.
  • 09-2 Effective Establishment of Native Grasses on Roadsides, PI Kuzovkina: The Final Report was reviewed by the Technical Advisory Committee.  It has been accepted with comments and the PI has requested that she be able to share it with her networks freely.
  • 09-3 Advanced Composite Materials in New England’s Transportation Infrastructure, PI Lopez-Anido: Project has ended and is complete, draft final report was shared with the technical committee.  Deadline for comments is August 24.
  • 10-3 Low Temperature and Moisture Susceptibility of RAP Mixtures with Warm Mix Technology, PI Mogawer: NCE request recently approved by Advisory Committee.  Will begin contract execution process.
  • 13-1 Development of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections, PI Brena: NCE request to 1/14/17 has been approved by Technical Committee.  Will be forwarded to Advisory Committee.
  • 13-2 HMA Mixtures Containing Recycled Asphalt Singles (RAS): Low Temperature Fatigue Performance of Plant-Produced Mixtures, PI Mogawer: NCE approved to 12/1/2017, contract extension in process.
  • 13-3 Improved Regionalization of Quality Assurance (QA) Functions, PI Dave: NCE approved to 9/30/2016, contract extension in process.  UNH has also requested a line item budget change from Graduate Students to Undergraduate students and the respective benefits adjustments.  This does not represent a change in scope for the project.
  • 14-1 Measuring the Effectiveness of Competency Models for Job Specific Professional Development of Engineers & Engineering Technicians, PI Ahmadjian: NCE approved to 12/31/2016, contract extension in process.
  • 14-2 Investigation of Northern Long-Eared Bat Roosting Sites on Bridges, PI Civjan: Summer bridge roosting monitoring is underway, as is the Inspection Reporting.  No further updates.
  • 14-4 Optimizing Future Work Zones in New England for Safety and Mobility, PI Xie: Task I report accepted by Technical Committee, Task II underway.
  • 15-1 Use of Forested Habitat Adjacent to Highways by Northern Long Ear Bats: Proposal evaluation is complete a ballot for advisory committee review is being prepared.
  • 15-2 Using the New SHRP2 Naturalistic Driving Study Safety Databases to Examine Safety Concerns for Older Drivers: Proposals have been reviewed and questions have been sent to the project teams.
  • 15-3 Moisture Susceptibility Testing for Hot Mix Asphalt Pavements in New England: Initial contract documents drafted, pending NETC Master Agreement modification.
  • 15-4 Optimizing Quality Assurance (QA) Processes for Asphalt Pavement Construction: Scope of work development delayed until NETC Program is revised and relaunched.

3. Other Business

  • NETC Advisory Meeting – Retreat Follow Up, September, 2016
    • http://doodle.com/poll/9aa7w8zsh5bgwt6z

4. Adjourn

Next Meeting – September 27, 2016, 11 AM – 12 PM

Filed Under: Meetings

Primary Sidebar

Search This Site

NETC Resources

  • 2024 NETC Research Peer Exchange
  • Completed Research Projects
    • 21-3 Initiating Seed Production for Effective Establishment of Native Plants on Roadsides in New England
    • 19-3 Load Rating Procedures for Steel Beam Ends
    • 20-2 Current Status of Transportation Data Analytics and Pilot Case Studies Using Artificial Intelligence (AI)
    • 21-1 Quality Review and Assessment of Pavement Condition Survey Vehicle Data Across New England
    • 20-3 Investigating Thermal Imaging Technologies and Unmanned Aerial Vehicles to Improve Bridge Inspections
    • 20-4 New England Connected and Automated Vehicle Legal, Regulatory and Policy Assessment – Members Only page
  • Research Project Webinars
  • Advisory Committee Meetings

Copyright © 2025 · New England Transportation Consortium · Log in